92713 BEHATEST High Voltage Proving Unit

Model:92713
Price:0US$

● 92713 DC High Voltage Generator/DC high voltage output box
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
-phasing sticks.
-high voltage detectors (contact type only, not to be used with non contact proximity detectors).
-high voltage and voltage testers.
 Details



BEHATEST High Voltage Proving Unit / DC Voltage Generator

Model: 92713


Introduction:
The high voltage proving unit for high voltage testers is utilized to determine if the devices under test are functionally working.
The high voltage proving unit is not a calibrator and can't be utilized for calibration.
The high voltage proving unit for high voltage testers can be utilized to proof contact devices on a momentary basis (press on, check, release).

Features:
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
  -phasing sticks.
  -high voltage detectors (contact type only, not to be used with non contact proximity detectors).
  -high voltage and voltage testers.
● Battery operated.
● Led indicates when power is "ON".
● Small and hand held.
● Quick connection with normal 4mm test leads.

Technical Data:
Voltage Settings 
(Internal Jumpers Selectable)   
500 V/DC
1000 V/DC
2500 V/DC
5000 V/DC (default setting)
Over-Current Protection
Yes
Power on Indicator
Yes
Operating Temperature
- 5 to 45
Storage Temperature
- 10 to 85
Power supply
6 x 1.5 V, IEC LR6
Dimensions
205 x 90 x 55 mm
Weight
Approx. 510g ( battery included)
 
Scope of Supply:
1 pc High voltage proving unit 92713
2 pc Test leads With Crocodile Clamps
6 pc Batteries 1.5 V, IEC LR6
1 pc Instruction Manual


Example1:


Proofing 9007KB Series - Multifunction Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The slave pole must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.


Example2:


Proofing 9007KB Series - Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The earth prod (or earth wire) must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.






 

 
 

  |About us | Contact | Copyright © 2011 Shanghai Beha Electronics Co.,Ltd |

夏津县| 朝阳市| 日喀则市| 霍邱县| 肇东市| 山东省| 芜湖市| 商都县| 左权县| 游戏| 毕节市| 云阳县| 广丰县| 通榆县| 车险| 渝北区| 丹阳市| 德令哈市| 二连浩特市| 平顶山市| 海门市| 曲水县| 德安县| 丰宁| 红安县| 体育| 五大连池市| 吉木乃县| 黎川县| 洪江市| 红桥区| 南宫市| 广水市| 河东区| 阜城县| 胶南市| 舞阳县| 八宿县| 弥勒县| 阿合奇县| 明溪县|