欧美一区二区午夜福利在线,精品国产欧美日韩不卡在线观看,精品国产野战一区二区三区,欧美日本高清在线不卡视频,99热久久这里只有精品,人妻少妇中文字幕在线一区,精品综合欧美一区二区三区,久久久久国产精品免费免费播放,久久精品少妇夫妻一区二区三区


92713 BEHATEST High Voltage Proving Unit

Model:92713
Price:0US$

● 92713 DC High Voltage Generator/DC high voltage output box
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
-phasing sticks.
-high voltage detectors (contact type only, not to be used with non contact proximity detectors).
-high voltage and voltage testers.
 Details



BEHATEST High Voltage Proving Unit / DC Voltage Generator

Model: 92713


Introduction:
The high voltage proving unit for high voltage testers is utilized to determine if the devices under test are functionally working.
The high voltage proving unit is not a calibrator and can't be utilized for calibration.
The high voltage proving unit for high voltage testers can be utilized to proof contact devices on a momentary basis (press on, check, release).

Features:
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
  -phasing sticks.
  -high voltage detectors (contact type only, not to be used with non contact proximity detectors).
  -high voltage and voltage testers.
● Battery operated.
● Led indicates when power is "ON".
● Small and hand held.
● Quick connection with normal 4mm test leads.

Technical Data:
Voltage Settings 
(Internal Jumpers Selectable)   
500 V/DC
1000 V/DC
2500 V/DC
5000 V/DC (default setting)
Over-Current Protection
Yes
Power on Indicator
Yes
Operating Temperature
- 5 to 45
Storage Temperature
- 10 to 85
Power supply
6 x 1.5 V, IEC LR6
Dimensions
205 x 90 x 55 mm
Weight
Approx. 510g ( battery included)
 
Scope of Supply:
1 pc High voltage proving unit 92713
2 pc Test leads With Crocodile Clamps
6 pc Batteries 1.5 V, IEC LR6
1 pc Instruction Manual


Example1:


Proofing 9007KB Series - Multifunction Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The slave pole must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.


Example2:


Proofing 9007KB Series - Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The earth prod (or earth wire) must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.






 

 
 

  |About us | Contact | Copyright © 2011 Shanghai Beha Electronics Co.,Ltd |

临潭县| 平舆县| 邢台市| 新营市| 河南省| 运城市| 株洲县| 闵行区| 南溪县| 九江县| 景谷| 凌云县| 南投市| 黄浦区| 喀喇| 江华| 黑山县| 苍梧县| 东乌珠穆沁旗| 华阴市| 莱阳市| 祁连县| 鸡西市| 靖西县| 宝兴县| 宜兰市| 苍山县| 黔西县| 房产| 高密市| 驻马店市| 湘乡市| 尉氏县| 布拖县| 昌吉市| 商都县| 定陶县| 井冈山市| 台江县| 庄浪县| 孟村|